For the first time, climate-related issues dominate the World Petroleum Congress. Despite the necessary course correction, one thing is clear: the traditional economic model will not change that quickly.
C1 Building Blocks for Future Industry – this was the title of the 31st conference of the Petrochemical Division of the DGMK from 11 to 13 October. This year’s venue was the Dresden Haus der Kirche within the walls of the baroque Dreikönigskirche, built between 1732 and 1739, whose premises provided a thoroughly appropriate setting for the event.
Taking its own know-how to the outside world: The DGMK’s GEO-Energy Systems Underground Technologies Division is looking confidently to the future at its spring conference in Celle.
Since the start of the Ukraine war, special attention has also been paid to the development of domestic energy raw materials, which have so far been sourced mainly from Russia. Against this background, the State Office for Mining, Energy and Geology…
Current issue
EEK 7-8/23
Topics of the current issue
Deep Geothermal Energy - Geothermal Energy Market Turkey - Status and Development of Hydrothermal Power Generation
Deep geothermal energy - With GRE to corrosion-resistant casing systems - Casing systems made of glass-fibre reinforced plastic
Exploration and Production - Foreign Activities of German and Austrian Oil/Natural Gas Producers
With a variety of energy carriers, production and application options from modern biofuels and synthetic fuels to CO2-neutral hydrogen, analytics faces complex challenges.
C1 Building Blocks for Future Industry – this was the title of the 31st conference of the Petrochemical Division of the DGMK from 11 to 13 October. This year’s venue was the Dresden Haus der Kirche within the walls of the baroque Dreikönigskirche, built between 1732 and 1739, whose premises provided a thoroughly appropriate setting for the event.